Skip to content
Basement Flood Lab
  • Home
  • About
  • Projects
    • Project 1: Performance Of Backwater Valves To Reduce Basement Flooding Due To Sewer Surcharge
    • Project 3: An evaluation of low impact development practices and residential basement flood risk
    • Project 4: Performance of foundation drainage systems and basement flood risk due to infiltration
    • Project 5: Prediction of flooding events using machine learning and statistical modeling approaches
  • Publications and Outputs
  • Contact Us
Basement Flood Lab
  • Home
  • About
  • Projects
    • Project 1: Performance Of Backwater Valves To Reduce Basement Flooding Due To Sewer Surcharge
    • Project 3: An evaluation of low impact development practices and residential basement flood risk
    • Project 4: Performance of foundation drainage systems and basement flood risk due to infiltration
    • Project 5: Prediction of flooding events using machine learning and statistical modeling approaches
  • Publications and Outputs
  • Contact Us

Contact Us

construction-icon26-1

Email Us

Dan Sandink, Director of Research

dsandink@iclr.org

Prof. Andrew Binns

binns@uoguelph.ca

SHARING

CONTACT

30-34 Duncan St, Toronto, ON, M5V2C3
(416) 364-8677
info@basementfloodlab

EXTERNAL LINKS

→ Institute for Catastrophic Loss Reduction

→ University of Guelph School of Engineering

→ Backwater Valve Installation Protocol